- Garage roof 2015
- Windows on the sides of the building were done in 2013
- Accommodation #449 was renovated in 2018
* Flooring, electricity, plumbing, gypsum, kitchen cabinet, bathroom, sound insulation in the ceiling between dwellings
Accommodation #449a
- Bath, toilet, ceramic redone in 2016
- Kitchen cabinet and backsplash in 2019
- 2 entrance doors have been changed
- The mortar joints were made in 2019 and some bricks changed.
- Urethane insulation in the basement.
INCLUSIONS
2 hot water tanks, wall-mounted heat pump at 449 Dufferin, central sweeper.